
Flooring
Engineered oak, herringbone, stone, LVT and fitted carpet — templated, levelled and laid by craftsmen who care about the millimetres.
What’s included

01
Engineered oak
Wide plank oak with a real hardwood wear layer — warm, modern and underfloor-heating compatible. Glued or floating, to your subfloor.





Flooring FAQ
- Engineered oak or LVT across a typical London ground floor (40–60 m²) takes 3–5 days including subfloor prep. Herringbone parquet takes longer — the pattern is laid by hand, so count 6–10 days for the same area. Carpet is usually a single day per room.
Start your floor
A few quick details so we can turn around an accurate, itemised quote within 48 hours.