Kitchens
From handleless island layouts to full open-plan knock-throughs — designed, built and finished by a single accountable team.
What’s included

01
Open-plan knock-throughs
Structural calcs, steel beams, made-good finishes. We handle building control sign-off and coordinate every trade through the mess and out the other side.





Kitchen FAQ
- Replacing units in the same layout is usually 2–3 weeks. A full kitchen refit with new worktops, appliances and decorating runs 4–6 weeks. A kitchen extension with knock-through and new glazing can take 10–16 weeks including structural work. We agree the timeline before we start and stick to it.